Construction Portable Toilet Rental in Fort Myers
Our construction toilet rental service operates on a fixed weekly route through Fort Myers. We secure each unit with ground-stake anchors—even during a mid-pour—to prevent shifting. This construction toilet rental delivery service area includes a porta potty and monthly billing.

Built around the regulation:
OSHA Worker Ratios for Unit Quantity Planning
1 per 20 Workers
One toilet per twenty workers is required for crews of twenty or fewer.
Female-Worker Add
Separate stalls when crews include workers of more than one gender.
Urinal Substitution
One urinal counts as one fixture up to one-third of the total required count.
Large-Crew Step
Crews of 200 or more run one fixture per 40 workers per shift.

Weekly Servicing Schedules on Active Job Sites
Rough-Site Logistics with Crane-Liftable Units
High-rise builds in Fort Myers need restrooms that cycle between floors without breaking the seal. Our jobsite units feature a reinforced steel cage with rigging eyes for tower crane lifts—waste tank intact—and a skid-mounted base for stability on hoist decks. Anchor on gravel or bolt to concrete; relocate between phases as the build progresses. Each unit’s holding tank drains via suction hose into vacuum trucks, meeting the OSHA 1910.141 sanitation rule for construction worker restrooms. Monthly contracts across Lee start with transparent monthly construction portable toilet rental pricing.
Construction Site Questions
-
+ How many units do I need for a thirty-worker crew?
Two standard units cover thirty workers under OSHA 1926.51(c) with sufficient waste tank capacity, while adding an ADA-compliant unit helps meet requirements for public-funded projects.
-
+ Can the service day be locked to a specific weekday?
Monthly contracts secure a fixed weekday and route window maintained for the entire life of the construction build.
-
+ What does monthly billing include?
Delivery, weekly servicing, paper and sanitizer top-ups, phase relocations and final pickup included.
-
+ Do you deliver to active concrete pours?
Pre-pour staging keeps units clear of forms, set on gravel ahead of the pour, then reposition once the pad cures.

Lock In Your Jobsite Service Today
Tell dispatch your jobsite address, peak headcount, and duration for your mobilization day to confirm pricing and service on that call — (239) 330-9417.